• NPI - Senior Material

    Leonardo DRS, Inc. (Melbourne, FL)
    …+ Create the Master Production Schedule (MPS) based on production capacity, materials availability and contractual requirements + Obtain agreement from production, ... materials and program office before execution of the MPS...processes and functional inter-relationships + Strong background in project material management + Extensive experience in production planning +… more
    Leonardo DRS, Inc. (11/01/24)
    - Save Job - Related Jobs - Block Source
  • Senior Supply Planner

    Teleflex (Morrisville, NC)
    Senior Supply Planner **Date:** Nov 4, 2024 **Location:** Morrisville, NC, US **Company:** Teleflex **Expected Travel** : Up to 10% **Requisition ID** :11232 ... that make a difference in patients' lives. **Position Summary** The Global Supply Planner will be responsible for managing and controlling a portfolio of products… more
    Teleflex (11/05/24)
    - Save Job - Related Jobs - Block Source
  • Manager, Operations Management

    L3Harris (Tempe, AZ)
    …assigned. This position will work closely with multiple functional areas to optimize material flow, equipment, and workforce requirements within the area to meet or ... improvement, remove waste and cost from their product lines, and improve material flows within the manufacturing process. Essential Functions: + Provide day to… more
    L3Harris (10/14/24)
    - Save Job - Related Jobs - Block Source